This website uses cookies and other technologies. By using it you agree to their use in accordance with the Cookie Policy.

Accessory

End plate 300

End plate 300

The end plate for the infiltration tunnel 300 is intended for assembly at the beginning and at the end of the bed line. The end plate can be attached to the tunnel 300 using special latches. The end plate is equipped with two connections Ø110 and one connection Ø160, Ø200, Ø315 mm, respectively.

The infiltration bed should be equipped with an air supply at its end. This can be done by using one of the two connections located on the top wall of each tunnel or by using the top connection in the closing end plate.

The end plate of the tunnel is made of HDPE (high-density polyethylene) by injection molding. The production method used allows to obtain products with a compact and lightweight structure. Each end plate has ribs that strengthen the structure.

Characteristics:

  • Made of high-density polyethylene HDPE
  • For infiltration of sewage and rainwater in the ground
  • Easy assembly
  • Convenient transportation
  • Lightweight design
  • Possibility of connecting tunnels into strings of any length
  • Ventilation connection Ø110/Ø160/Ø200 mm at the top of the tunnel
  • Inlet connections in the end plate with diameters Ø110, Ø160, Ø200, Ø315 mm 
  • Possibility of installation in places with traffic up to 3.5T
  • Resistance to chemical corrosion
  • High mechanical resistance
  • New generation of traditional drainage

Product code: 2675     EAN: 5901095526756

MATERIAŁY DO POBRANIA

The end plate 300 technical data:

Length [mm]
54
Width [mm]
685
Height [mm]
465
Weight [kg]
2,1
Bottom infiltration area [m2]
Side infiltration area [m2]
Total infiltration area [m2]
Code
2675

The infiltration tunnel 300 technical data:

Length [mm]
1200
Width [mm]
800
Height [mm]
520
Weight [kg]
11
Bottom infiltration area [m2]
1,0
Side infiltration area [m2]
0,9
Total infiltration area [m2]
1,9
Code
2674
Not sure what to choose?
Contact us!